Georgia Department of Transportation continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, December 28 through Friday, January 3, 2025.
Holiday lane closure restrictions will be in place beginning Tuesday, Dec. 31 at 5 a.m. until Thursday, January 2, 2025, at 5 a.m. No lane closures or work that restricts or interferes with traffic on Interstates and major state highways will be conducted during this timeframe.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
I-95 SB & NB/ at MP 88 - 92 Chatham County
Northbound & Southbound Left Lane Closure
Pouring Concrete Footer for Signs
Nightly Single Lane Closure
12/05/2024 - 04/29/2025
I-95 @ Crooked River Camden County
Bridge Maintenance/Rehabilitation
Laurel Island Pkwy (Exit 6) to Hariett Bluff Rd (Exit 7)
Nightly Lane Closures 7pm-7am thru January 2025
I-95 SB & NB at MP 85 – 112 Bryan/Chatham County
North & Southbound Left Lane Closures
Concrete Work for Sign Improvements
Nightly Sunday – Saturday 7pm – 7am
November 10, 2024 – January 12, 2025
Bridge & Road Closures with Detours
Birdford Lake Rd Tattnall County
Bridge/Road Closed for Storm Damage Repairs
11/25/24 - 1/1/25
Detour via US 301, E. Hencart Rd, John M. Brewton Rd
Post Rd Jeff Davis County
Bridge/Road Closed for Bridge Replacement
12/2/24 - 6/22/25
Detour via Pine Level Church Rd, SR 19, Ira Graham Rd, Brantley Rd, Philadelphia Church Rd, Taylor Rd
Rayonier Rd at Spring Grove Rd Wayne County
Roundabout Construction
90-day Rayonier Road Closure
11/17/24 - 2/28/25
Detour: Rayonier Rd., Spring Groove Rd., SR 169, Rayonier Rd.
Bridge Construction, Rehabilitation, and Maintenance
US 17 Northbound (NB) Glynn County
NB Bridge Closure over Cypress Mill Creek for Repairs
Between 4th St and SR 25 Spur/Golden Isles Pkwy
NB Single Lane Traffic Shift to SB Bridge
US 84/SR 38 at Doctors Creek Long County
From Maple Road NE to Austin Lane SE (MP.0 to 2.00)
Westbound Bridge Replacement Project
On-site Detour Begins Thurs., Aug. 8
Westbound Median Crossover Detour
Signal Lane Traffic in Both Directions on Eastbound Bridge
US 84/SR 38 at Satilla River Pierce/Ware Counties
Northside of Bridge Closed to Traffic for Replacement
Signal Lane Traffic in Both Directions on Southside of the Bridge
US 82/SR 520 at Satilla River Overflow Bridge Brantley County
Lane Closures for Bridge Replacement Project
New Westbound Bridge Opened July 2024
SR 38/US 84 @ Little McMillan Creek Wayne County
Median Crossover Detour with Lane Closure
7/28/24 - 1/31/26
Resurfacing
SR 38/US 84 and Old Sunbury Road Liberty County
From Joseph Martin Rd to Old Hines Rd
Daily/Nightly Lane Closures for Installation of Median
Sunday - Friday 7pm to 6am
SR 119/Taylors Creek MP 23 to MP 24 Liberty County
From SR 119 at Taylors Creek
Intermittent Flagging Operations for Bridge Construction
Pavement Operations
Temporary Traffic Stoppages, Flagging operations & Lane Closures
SR 169 Wayne/Appling Counties
From Sunset Blvd to SR 121
Temporary Traffic Stoppages, Flagging operations & Lane Closures
8/31/2025
Other Traffic Interruptions
US/17/SR 25 Southbound Glynn County
Areas between Wildwood Dr. & SR 25 Conn./Torras Causeway
Single Lane Closure for Sidewalk Repairs
Mon. - Thurs. 7am to 4pm
12/3/2024 thru 1/2/2025
SR 21/SR 30 Chatham County
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Work on Striping
Monday - Friday 7pm to 6am
SR 25/Burnsed Blvd. Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening, Asphalt Leveling & Paving Operations
Daily Lane Closures
US 80/SR 26/Ogeechee Rd Chatham County
From Victory Dr to Tremont Rd (MP 16.27 to MP 18.00)
Utilities work needed from Liberty Pkwy to Horizon Pkwy
Road Widening/Paving Operations & Bridge Construction over CSX Railroad Daily Lane Closures
SR 25 Glynn County
Yacht Road to SR 99
Daily Lane Closures with Flagging Operation
Monday - Friday, 9am - 4pm and 6pm - 7am
Expected Completion 3rd Quarter 2025
US 17/SR 25 AT SR 99 Glynn County
Roundabout Construction on US 17/SR 25 at SR 99
Daily Lane Closures with Flagging Operation
Expected Completion 1st Quarter 2025
Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.