Skip to content
Join our Newsletter

Interstate Closure Advisory for the 16@95 Improvement Projects

Weekly DOT Interstate 16@95 construction advisory | July 18-23, 2022
16@96-071022
Construction at 16@95 Credit: GA DOT

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

Daytime Closures

Monday, July 18, through Saturday, July 23, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations:
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, July 18, through Saturday, July 23, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations:
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, July 18, through Saturday, July 23, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations:
I-516 westbound at the I-16 Interchange from MP 5 to MP 6
I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Monday, July 18, through Saturday, July 23, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations:
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, July 18, through Saturday, July 23, 9 p.m. to 5 a.m.
Double lane closures at the following locations:
I-95 northbound @ I-16 overpass (MP 98 to MP 100)
I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Continuous Closure

Friday, July 15, 7 p.m. through Monday, July 18, 5 a.m.
Single lane closures at the following location
I-95 southbound @ I-16 overpass (MP 99 to MP 98)

Nighttime Closure & Detour

Monday, July 18, through Sunday, July 24, 8 p.m. to 6 a.m. (Nightly)
I-16 eastbound to I-516 westbound ramp (Exit 164B) (Map)
Motorists traveling on I-16 eastbound should take the I-516 eastbound ramp (Exit 164A), then exit at US 17/US 80/Ogeechee Road (Exit 3), turn left off the ramp, then turn left to access I-516 westbound.

Long-term Closure

June 2, 2022, through May 31, 2023
Tremont Road under I-16 (Map)
Note: Tremont Road will be open during holiday work restriction time frames.
Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4).
Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16.

ADVISORY:

Exact times may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Additional project information is available at
https://majormobilityga.com/projects/i1695improvements/